According to the KCCA Project Coordinator Eng. Stephen Kibuuka, the contractor has been authorized to carry out night works as soon as possible to achieve delivery of substantial works by December 2020. KCCA wants the carriageway, the walkway and drainage system to be fully constructed and the road operational by December.