Breaking

Archive

Apr 2020 1 result
16:57
16:57

Kiira, Bujagali Power Plants Fully Restored - Eskom operation 2 2 Top story

According to ESKOM Uganda Limited, the company with a concession to operate and maintain Nalubaale and Kiira Hydro Power stations, the floating Island which originated from Lake Victoria Basin as a result of the current rising water levels created extensive debris and waste material that blocked the water intake screens, through which water for power generation is transported.
Apr 2020 1 result