Breaking

Archive

Sep 2 results
13:21
13:21

Reconstruction of Mayanja Bridge Stalls over Lack of Funds river mayanja 2

The Wakiso District Engineer, Samuel Mwesigwa says although they had put up a temporary wooden deck at the section, there is need to construct a permanent bridge.
18:42
18:42

Wakiso Floods: Police Recovers Three Victims, Two Bodies encroachers 2 1 Top story

Residents have admitted being the root cause of the problem. Alex Mulindwa, a resident of Matuga, says the damage would have been minimal if residents hadnt reclaimed wetlands.
Sep 2 results