Breaking

Archive

Aug 2020 2 results
18:22
18:22

Mukono Residents Pursue Redevelopment of Kyetume Abattoir ICD 3 3

The abattoir, sitting on 40 acres of land at Kyetume trading centre near the Uganda Railway Corporation inland container depot in Mukono, was set up in the 1960s. At the time, it housed the biggest slaughterhouse and a cattle market in the Central region.
10:01
10:01

Kyenjojo District Failed to Utilize UGX 1.4Bn in 2019/2020 Financial Year scholastic material 1 1

Kaija said that 86 million shillings had been budgeted for the construction of Mparo Seed Secondary School and 96 million shillings was to be spent by the education sector to cater for different requirements of schools but all could not be possible due to the closure of schools.
Aug 2020 2 results