Breaking

Archive

Feb 2021 1 result
10:41
10:41

UGX 1.8Bn Project for Mitigating Elegu Floods Stalls after MOU Signing River Unyama 2 1

Michael Lakony, the Amuru District Chairman told URN in an interview that upon signing the MOU with the Ministry of Trade, a team of Engineers was dispatched to Elegu to carry out a feasibility study to pave way for the constructions but to date, nothing has been done.
Feb 2021 1 result