Charles Mugisha, the manager of Saem Engineering Company Limited that is currently running the hydro project, says human activities along the river banks like farming have led to silting and reduction in the water levels which has, in turn, led to a reduction in power generation.
Eng Steven Ogwete, the project coordinator, said that the fully-fledged facility was constructed with the aim of promoting Trans-boundary Corporation between Uganda and Democratic Republic of Congo – DRC among other benefits.