Angela Namala, the acting Director of Jinja Regional Referral Hospital, who declined to reveal the cost of the entire renovation works told URN on Sunday that the ICU ward needed a facelift and the repair of some of the interior fittings.
James Ongicha, the engineering technician and regional workshop manager says that, the plant used to refill five cylinders in two hours, however, it currently performs the same task for close to four hours, which creates the need to service it urgently.
According to ESKOM Uganda Limited, the company with a concession to operate and maintain Nalubaale and Kiira Hydro Power stations, the floating Island which originated from Lake Victoria Basin as a result of the current rising water levels created extensive debris and waste material that blocked the water intake screens, through which water for power generation is transported.
The victim, who was reportedly taken to the shrine by her suspected defiler Ivan Magunda on Sunday night, suffered excessive bleeding and tear’s which required urgent medical attention.
Speaking during a special council sitting held at the district headquarters on Thursday, Richard Mbazira, the male councillor representing Walukuba-Masese division says that, Sakwa refers to local leaders as illiterates who cannot do much for their people.
Unveiling the 2019 tourism plan, the Kingdom’s Tourism Minister, Hellen Namutamba says that, most European tourists are attracted to African culture arguing that people who own traditional homes will gain out of this venture.