Breaking

Archive

Jan 1 result
13:21
13:21

Reconstruction of Mayanja Bridge Stalls over Lack of Funds river mayanja 2

The Wakiso District Engineer, Samuel Mwesigwa says although they had put up a temporary wooden deck at the section, there is need to construct a permanent bridge.
Jan 1 result