Breaking

Archive

Jul 2020 1 result
11:27
11:27

Oil Roads Boosting Roadside Markets in Bunyoro critical oil roads 1 4

The key roads under construction include Masindi-Kigumba-Hoima-Kabwoya (135 Km), Kyenjojo-Hoima-Masindi-Kigumba (238 Km) and Hoima-Wanseko (111 Km). The other is the 92km Hoima- Kaiso-Tonya road that was completed in 2014, as part of several infrastructural developments projects undertaken in the Albertine Region in preparation for oil production.
Jul 2020 1 result